PROJECTS Showing Results 10 - 20 of 86

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, blasting & painting, mechanical completion, testing & commissioning, load out, sea fastening, hook up & commissioning. Maghtumguly Drilling Platform-A Project Temporary construction facilities, earthworks, engineering and design, fabrication, E&I, topside integration, jackets integration, pile fabrication, b.. Petronas Carigali (Turkmenistan)Sdn. Bhd, MMHE – Technip J.V. Oil & Gas Upstream Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning. Tankage Works at OGT Project Fabrication, erection, installation, NDT and hydro test of 11 pieces fixed & floating roof tanks, painting and commissioning. Petronas Carigali (Turkmenistan) Sdn. Bhd., MMHE Technip J.V. - Sumatec Oil & Gas Downstream Turkmenistan / Turkmenbashi Completed Projects
Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities. EPCC of Central Diyarbekir Oil Development Project Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water depth is 53.4 m. EPCC of West Diyarbekir Drilling Platform Project Engineering, Procurement, Fabrication, Integration, Load Out and Commissioning of Drilling platform, Host tie in works in MCRA, MOPU and FSO. Water de.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Turkmenbashi Completed Projects
EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. EPCC of Garagol Deniz West Offshore Platform Project EPCC of 10.000 bpd oil and 35 mmscfd gas production capacity offshore fixed platform which will be located in Caspian Sea 35 m water depth. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan Completed Projects
Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant subsea pipeline and cabling works. (Total : 3 Jackets - Topsides - Drilling Decks - Boatlandings and 14 Piles) EPIC of Offshore Transportation & Installation Works Offshore transportation installation and grouting works for West Diyarbekir and Central Diyarbekir and Garagol Deniz Drilling Platforms and relevant s.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Oil & Gas Upstream Turkmenistan / Kiyanly Completed Projects
Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. EPCC of Temporary Camp Facilities of Turkmenbashi Onshore Gas Terminal Project Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. Petronas Carigali (Turkmenistan) Sdn. Bhd. Civil, Architectural, Infrastr. Turkmenistan / Turkmenbashi Completed Projects
Engineering, Procurement, Construction, and Completion (EPCC) of the North and South Breakwaters, and Associated Works including quaywall, wharf, mooring facility, access roads and temporary works at proposed new Kiyanly Supply Base (KSB), Turkmenistan. EPCC of Break water, Quay Wall, Mooring Facilities, Wharf, Beacon Light and Auxiliary Works Project Engineering, Procurement, Construction, and Completion (EPCC) of the North and South Breakwaters, and Associated Works including quaywall, wharf, moor.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
PCC of 106 nos 800 mm diameter bored secant pile.  Average pile height is 15 m. PCC of Secant Pile for Wharf Zone I & III Project PCC of 106 nos 800 mm diameter bored secant pile. Average pile height is 15 m. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Turkmenbashi Completed Projects
EPCC of CPF and GTU Substation Buildings and Pipe Spool. EPCC of Gas Field Development Project EPCC of CPF and GTU Substation Buildings and Pipe Spool Fabrication Works. EPCC of CPF and GTU Substation Buildings and Pipe Spool. Petrofac International (U.A.E.) Oil & Gas Downstream Turkmenistan / Yoloten / Mary Completed Projects