PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Procurement, Construction, Tie-in and Commissioning of New Main Brine Intake Pumping Statin at Dead Sea. 561 nos vertical and raked steel pile, 7,000 tons steel structure, 15,000 m2 timber, 12,000 meters process pipe, 12,000 m3 concrete, 2,300 tons rebar, 4 nos pump, 10,000 meters cable to be supplied, constructed and commissioned. New Main Brine Intake Pumping Station Construction Project (Civil & E/M Works) Procurement, Construction, Tie-in and Commissioning of New Main Brine Intake Pumping Statin at Dead Sea. 561 nos vertical and raked steel pile, 7,000 .. Arab Potash Company Ltd. Marine Structures Jordan Projects in Progress
Turkey Turkey Hunutlu Thermal Power Plant Project 2×660 MW Ultra-Supercritical Units – Engineering, Procurement and Construction of Marine Structures. EPC of Turkey Hunutlu Thermal Power Plant Project 2×660 MW Ultra-Supercritical Units – Engineering, Procurement and Construction of Marine Structures. Turkey Turkey Hunutlu Thermal Power Plant Project 2×660 MW Ultra-Supercritical Units – Engineering, Procurement and Construction of Marine Structures... CPI Power Engineering Co., Ltd. Marine Structures Turkey Completed Projects
The Detailed Engineering, Procurement, Construction, installation and Commissioning of berth facilities. Upgrade Of Berths The Detailed Engineering, Procurement, Construction, installation and Commissioning of berth facilities. Dragon Oil Ltd. Marine Structures Turkmenistan Completed Projects
Engineering, Procurement, Construction, and Completion (EPCC) of the North and South Breakwaters, and Associated Works including quaywall, wharf, mooring facility, access roads and temporary works at proposed new Kiyanly Supply Base (KSB), Turkmenistan. EPCC of Break water, Quay Wall, Mooring Facilities, Wharf, Beacon Light and Auxiliary Works Project Engineering, Procurement, Construction, and Completion (EPCC) of the North and South Breakwaters, and Associated Works including quaywall, wharf, moor.. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Kiyanly / Turkmenbashi Completed Projects
Construction of the Reinforced Concrete Package of offshore Leisure Facility in Boulevard Area. Sadko Project Phase II Construction of the Reinforced Concrete Package of offshore Leisure Facility in Boulevard Area. Aikon Construction MMC. Marine Structures Azerbaijan / Baku Completed Projects
PCC of 106 nos 800 mm diameter bored secant pile.  Average pile height is 15 m. PCC of Secant Pile for Wharf Zone I & III Project PCC of 106 nos 800 mm diameter bored secant pile. Average pile height is 15 m. Petronas Carigali (Turkmenistan) Sdn. Bhd. Marine Structures Turkmenistan / Turkmenbashi Completed Projects
Construction of 56 m length and 7.5 m bridge and access roads. Pipe piles, pile cap beams, steel beams, concrete slab and road asphalting works. EPC of New Bridge Construction Over Murgap River Project Construction of 56 m length and 7.5 m bridge and access roads. Pipe piles, pile cap beams, steel beams, concrete slab and road asphalting works. Turkmen Gas / Petrofac Int. (U.A.E.) Marine Structures Turkmenistan / Yoloten / Mary Completed Projects