PROJECTS Showing Results 10 - 30 of 47

PROJECT     CLIENT     CLASSIFICATION     LOCATION     STATUS    
Reinforced concrete works of city water treatment facility. Ashgabat City Water Treatment Project Reinforced concrete works of city water treatment facility. CAI Interbudmontaz Civil, Architectural, Infrastr. Turkmenistan / Ashgabat Completed Projects
Boreholes, sampling, in-situ and laboratory testings. Geo-Technical Survey for GTP in CPF Area and Harbour Berth 5 & 6 Boreholes, sampling, in-situ and laboratory testings. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. EPCC of Temporary Camp Facilities of Turkmenbashi Onshore Gas Terminal Project Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity. Petronas Carigali (Turkmenistan) Sdn. Bhd. Civil, Architectural, Infrastr. Turkmenistan / Turkmenbashi Completed Projects
Sea and ground surveys at parts of the Caspian and Aladja Land. Geo-Technical Survey at Hazar Harbour and Aladja Sea and ground surveys at parts of the Caspian and Aladja Land. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turn-key construction of mechanical workshop and car wash building. EPIC of Mechanical Workshop Turn-key construction of mechanical workshop and car wash building. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Turnkey construction of 8 storey business plaza. Atasehir İLK Doguş Plaza Project Turnkey construction of 8 storey business plaza. Land Development Project Civil, Architectural, Infrastr. Turkey / istanbul Completed Projects
Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. EPCC of Waste Disposal Facility Project Design and construction of 15 year capacity of hydrocarbon, non-hydrocarbon and domestic wastes disposal / storage cells. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks. EPCC of Polyclinic Project Design, procurement, construction and commissioning of 100 person per day capacity polyclinic building. Including technical building and storage tanks.. Dragon Oil Ltd. Civil, Architectural, Infrastr. Turkmenistan / Hazar Completed Projects
Reinforced concrete and block works of Technical University. UGMK Technical University Construction Project Reinforced concrete and block works of Technical University. ODD Uralyevrostil Civil, Architectural, Infrastr. Russia / V. Pishma Completed Projects
Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastructure such as 1.000 m³ sewage treatment plant, area lighting works and other offsite utilities. EPCC of Baku Shipyard Project Engineering, procurement, construction and commissioning of 24.000 m² closed area shipyard project steel and reinforced concrete buildings, infrastruc.. Oil & Gas Trust SOCAR Civil, Architectural, Infrastr. Azerbaijan / Baku Completed Projects