![53dd42fd6d5d9.jpg Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works.](http://www.ilkconstruction.com/Images/Projeler/Proje/53dd42fd6d5d9.jpg) |
The State Commodity and Raw Material Exchange Residential Building Project
Turn-key construction of 12 floors 72 flats residential building. Earthworks, civil works, mechanical and electrical works.
|
Administration of The President Turkmenistan |
Civil, Architectural, Infrastr. |
Turkmenistan / Ashgabat |
Completed Projects |
![53dd449a8f2cb.jpg Turn-key construction of 12 floors 48 flats residential building.](http://www.ilkconstruction.com/Images/Projeler/Proje/53dd449a8f2cb.jpg) |
Central Bank Residential Building Construction Project
Turn-key construction of 12 floors 48 flats residential building.
|
Central Bank of Turkmenistan |
Civil, Architectural, Infrastr. |
Turkmenistan / Ashgabat |
Completed Projects |
![53dd472f4f02c.jpg Turn-key construction park project with 30 pieces fountains and green area.](http://www.ilkconstruction.com/Images/Projeler/Proje/53dd472f4f02c.jpg) |
EPCC of Gipcak Resting Park Project
Turn-key construction park project with 30 pieces fountains and green area.
|
Ministry of Railway Transportation of Turkmenistan |
Civil, Architectural, Infrastr. |
Turkmenistan / Ashgabat |
Completed Projects |
![53dd49aa33fc2.jpg Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project.](http://www.ilkconstruction.com/Images/Projeler/Proje/53dd49aa33fc2.jpg) |
South Yoloten Gas Field Development Project
Earthworks, Infrastructure, Soil Investigation and Topographic & U/G Survey Works of South Yoloten Gas Field Development Project.
|
Petrofac International (U.A.E.) |
Civil, Architectural, Infrastr. |
Turkmenistan / Yoloten / Mary |
Completed Projects |
![53de191d2a4fc.jpg Turn-key construction of 1 storey building with infrastructure connections.](http://www.ilkconstruction.com/Images/Projeler/Proje/53de191d2a4fc.jpg) |
EPCC of Centre of Excellence Building Project
Turn-key construction of 1 storey building with infrastructure connections.
|
Dragon Oil Ltd. |
Civil, Architectural, Infrastr. |
Turkmenistan / Hazar |
Completed Projects |
![53de19d5bb273.jpg Turn-key construction of mechanical workshop and car wash building.](http://www.ilkconstruction.com/Images/Projeler/Proje/53de19d5bb273.jpg) |
EPIC of Mechanical Workshop
Turn-key construction of mechanical workshop and car wash building.
|
Dragon Oil Ltd. |
Civil, Architectural, Infrastr. |
Turkmenistan / Hazar |
Completed Projects |
![53de1d5eb154d.jpg Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant including 550 m sheet piling complete with piping installation (2 meters below sea level).](http://www.ilkconstruction.com/Images/Projeler/Proje/53de1d5eb154d.jpg) |
Water Desalination and Intake Line Project
Civil, architectural work and 6.8 km onshore piping (4.6 km trench excavation), 300 m offshore subsea piping works of water desalination plant includi..
|
Dragon Oil Ltd. |
Civil, Architectural, Infrastr. |
Turkmenistan / Hazar |
Completed Projects |
![53de1e22bdb40.jpg Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity.](http://www.ilkconstruction.com/Images/Projeler/Proje/53de1e22bdb40.jpg) |
EPCC of Temporary Camp Facilities of Turkmenbashi Onshore Gas Terminal Project
Turn-key construction of accommodation, office and other mobilization facilities. 2.400 m² closed area and 200 person capacity.
|
Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Civil, Architectural, Infrastr. |
Turkmenistan / Turkmenbashi |
Completed Projects |
![53de1f465b60a.jpg Phase I : Procurement & erection of 10 nos onshore cabins,
Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins including furniture, stairs and roof structure etc.](http://www.ilkconstruction.com/Images/Projeler/Proje/53de1f465b60a.jpg) |
Supply of Onshore & Offshore Cabins Phase I & II
Phase I : Procurement & erection of 10 nos onshore cabins,
Phase II: Procurement & erection of 12 nos onshore cabins and 32 nos offshore cabins incl..
|
Dragon Oil Ltd. |
Civil, Architectural, Infrastr. |
Turkmenistan / Hazar |
Completed Projects |
![53de21a7911a1.jpg Phase I : Turnkey construction of 6 villas.
Phase II: Turnkey construction of 6 villas combined of 12 separate houses.](http://www.ilkconstruction.com/Images/Projeler/Proje/53de21a7911a1.jpg) |
Zekeriyakoy Villa Project Phase I & II
Phase I : Turnkey construction of 6 villas.
Phase II: Turnkey construction of 6 villas combined of 12 separate houses.
|
Land Development Project |
Civil, Architectural, Infrastr. |
Turkey / istanbul |
Completed Projects |