İLK CONSTRUCTION// Oil & Gas //Downstream

EPIC of Crude Oil Tank Farm Terminal Project

  • CLIENTDragon Oil Ltd.
  • LOCATION Turkmenistan
    Show on Map
  • STATUS Project in Progress
  • Engineering, procurement, installation and commissioning of 8 new tanks and related civil, mechanical, piping, E&I works next to Dragon Oil CPF area.


Main Products

Tank Description


Roof Type


Total Capacity

Crude oil storage tank

60 m / 16,2 m

c / w fixed roof.

5 nos

254.000 BBL

Crude oil storage tank

39 m / 18,4 m

c / w fixed roof.

3 nos

100.000 BBL

Fire water storage tank

30 m / 15 m

c / w fixed umbrella roof.

2 nos

66.232 BBL

Diesel storage tank

11 m / 4,8 m

n / a

1 nos

597 BBL


  • Total 1.5 million barrel storing capacity.
  • 2 nos of Crude Pre-Heater to heat the incoming crude from 25°C to 38°C. Total quantity from shell side is 115.517 kg/hr and from tube side is 751.734 kg/hr.
  • Hot Oil Heating system CPSF-A-005 is designed for 135.300 BOPD flow rate.
  • Vapour Recovery System for both existing and new facility. For one of the system’s capacity at summer is 1.1 MMSCFD and at winter is 1.3 MMSCFD. For other system at summer is 1.3 MMSCFD and at winter is 1.5MMSCFD.
  • 7 nos of Export Oil Pumps are designed for 35.172 BOPD and Karagel Export Oil Pump is designed for 30.191 BOPD flow rate.
  • 8 nos of metering skid. 5 of them are designed for 211.300 BOPD and three of them are designed for 135.300 BOPD.


Information Society Services